Triton prides itself on offering a wide cross-section of professional services for our many, varied clients. Triton has worked for clients as large as multi-national oil, mining, and transportation companies to smaller companies investing in independent power projects. From linear development projects to First Nations consultations and public hearings, Triton brings a wealth of experience to all our projects.

For more information on how we can help your company with your project, contact the Operations Manager in any of our offices.  Contact Us

Triton's recent projects highlights:

Cheakamus River Recovery Planning and Monitoring

Design and implementation of multi-year monitoring programs to assess recovery of fish and benthic invertebrates following a train derailment and subsequent spill of sodium hydroxide into the Cheakamus River.
   

Salmon River Horizontal Directional Drill

Aspects of the project included conduct-ing assessments, envrionmental moni-toring, developing erosion and sediment control plans, and at construction completion, Triton will assist in habitat compensation plans, post-construction reporting and follow-up sampling.

   

Forage Assessments of Operationally Reclaimed Sites

Triton crews complete annual vegetation surveys for Highland Valley Copper (Teck) to determine if reclamation strategies at the mine are achieving specific biomass, species composition, and foliar nutrient targets related to creating wildlife and livestock habitat.
   

Long Lake Hydro Project

This 28 MW Independent Power Project is located largely within historical mining sites 20 km north of Stewart, BC. Since permitting in 2005, Triton has been retained to fulfill outstanding permit conditions and address substantial changes to powerline design and power generating capacity.

   

Middle Columbia River Juvenile Fish Habitat Use

To assess the effects of flow manipula-tion on juvenile fish habitat use down-stream of the Revelstoke Dam, Triton crews have completed two years of a 6- year study involving night time boat electrofishing on the Middle Columbia.
   

Kitimat Moderization Project

Triton provides ongoing environmental services and fisheries related expertise to Rio Tinto Alcan (former Alcan Inc.).
   

Nechako River White Sturgeon Monitoring 

Triton has been involved with the monitoring of the Nechako River White sturgeon population since 2004 which involves tracking radio-tagged fish using aerial, boat, and ground-based telemetry and documentation of spawning activity.
   

Ongoing Environmental Services

Triton provides environmental services and fisheries related expertise to Pacific Northern Gas. Triton is frequently retained to provide sound environmental advice related to sensitive, large watercourse crossings, emergency works, and access management.
   

Tuck Road Improvement Project

Since 2001, Triton has permitted and audited various components of the Tuck Road Improvement Project which includes the a ferry terminal at Aero Point Cove in Prince Rupert, BC to 22 km of road construction between Tuck Inlet and Lax Kw’alaams.
   

Log and Kookipi Hydroelectric Projects

Biological baseline data collection and environmental impact assessment of two run-of-river power projects. Components include instream flow transects, ramping rates, side channel connectivity, fish abundance, invertebrates, water quality, transmission line corridor assessments.
   

Dinosaur Reservoir Tributary Inventory

In an effort to improve fish resources in the Dinosaur Lake Reservoir near Hudson’s Hope, BC Hydro has initiated an inventory of direct tributaries. The project's goal is to identify streams with fish habitat value, and priority rank them for potential access and/or habitat enhancements.

   

Highway 97 Four-Laning Projects

Triton has completed the environmental impact assessments, CEAA screening reports, and onsite environmental monitoring for six sections of Highway 97 between Cache Creek and Prince George for the BC Ministry of Transportation.